The improvement and expansion of the riverside roads of the Tam Bac River embellishment project are to enhance the convenient transportation connection with the main roads in the region; ensure safety and reduce traffic congestion; increase development capacity; contribute to the construction of technical infrastructure and drainage; upgrade the landscape of the area.
Contributing to this city project, Vietnam Cast Iron was responsible for produce the railing and lamp post for Tam Bac Riverside which has a total of area up to 50 000 m2.
Cast iron material and green sand casting method chose to cast products that guarantee excellent design and quality for the final outcomes.
The project was implemented for 6 months divided into 2 periods depending on the disbursement progress.